1. |
In which method of Plate laying a temporary line is laid by side the of the proposed railway track? |
A. | Tram line method |
B. | American method |
C. | Telescopic method |
D. | British method |
Answer» B. American method | |
2. |
Which of the following is not a part of Plate laying or Track linking? |
A. | Laying sleepers |
B. | Formation of embankment or cutting |
C. | Laying rails |
D. | Laying fastenings |
Answer» C. Laying rails | |
3. |
What are the factors on which the design of Bridges of railway are dependent? |
A. | Topography of the country |
B. | Type of stream to be covered |
C. | Topography and Type of stream |
D. | Topography, type of stream and Local bodies of the area |
Answer» D. Topography, type of stream and Local bodies of the area | |
4. |
Why is the section where earthwork is to be donedivided into different zones? |
A. | Earthwork required is less |
B. | For early execution of earthwork |
C. | To provide different facilities to sections |
D. | To increase traffic flow |
Answer» C. To provide different facilities to sections | |
5. |
Which curve is used to determine the economical lead of moving earth in the longitudinal direction? |
A. | Mass-haul curve |
B. | Optimum moisture content curve |
C. | Plasticity index curve |
D. | Atterberg limits curve |
Answer» B. Optimum moisture content curve | |
6. |
What is the objective of doing mechanical compaction after laying each layer? |
A. | To obtain maximum moisture content |
B. | To obtain minimum dry density |
C. | To obtain maximum dry density at optimum moisture content |
D. | To increase coarse grain content |
Answer» D. To increase coarse grain content | |
7. |
Why is the Formation of an embankment preferred over formation in a cutting? |
A. | It is economical |
B. | It has good drainage properties |
C. | It is easy to construct |
D. | Less earthwork required |
Answer» C. It is easy to construct | |
8. |
What does the slide slope provided for the embankment depends upon? |
A. | Cost of construction |
B. | Traffic flow |
C. | Nature of soil |
D. | Rainfall intensity of that area |
Answer» D. Rainfall intensity of that area | |
9. |
If we want to construct a single line railway track, the land available should be adequate for the construction of a double line. |
A. | True |
B. | False |
Answer» B. False | |
10. |
Where should one refer to for the procedure of acquisition of land with the help of member state government? |
A. | Land Acquisition act |
B. | Land Surveying act |
C. | Rules of Railway Board |
D. | Indian Standard codes |
Answer» B. Land Surveying act | |
11. |
What is the first step involved in Construction of a New line? |
A. | Ballasting of track |
B. | Land acquisition |
C. | Earthwork and bridges |
D. | Plate laying |
Answer» C. Earthwork and bridges | |