				This section includes 11 Mcqs, each offering curated multiple-choice questions to sharpen your Railway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | In which method of Plate laying a temporary line is laid by side the of the proposed railway track? | 
| A. | Tram line method | 
| B. | American method | 
| C. | Telescopic method | 
| D. | British method | 
| Answer» B. American method | |
| 2. | Which of the following is not a part of Plate laying or Track linking? | 
| A. | Laying sleepers | 
| B. | Formation of embankment or cutting | 
| C. | Laying rails | 
| D. | Laying fastenings | 
| Answer» C. Laying rails | |
| 3. | What are the factors on which the design of Bridges of railway are dependent? | 
| A. | Topography of the country | 
| B. | Type of stream to be covered | 
| C. | Topography and Type of stream | 
| D. | Topography, type of stream and Local bodies of the area | 
| Answer» D. Topography, type of stream and Local bodies of the area | |
| 4. | Why is the section where earthwork is to be donedivided into different zones? | 
| A. | Earthwork required is less | 
| B. | For early execution of earthwork | 
| C. | To provide different facilities to sections | 
| D. | To increase traffic flow | 
| Answer» C. To provide different facilities to sections | |
| 5. | Which curve is used to determine the economical lead of moving earth in the longitudinal direction? | 
| A. | Mass-haul curve | 
| B. | Optimum moisture content curve | 
| C. | Plasticity index curve | 
| D. | Atterberg limits curve | 
| Answer» B. Optimum moisture content curve | |
| 6. | What is the objective of doing mechanical compaction after laying each layer? | 
| A. | To obtain maximum moisture content | 
| B. | To obtain minimum dry density | 
| C. | To obtain maximum dry density at optimum moisture content | 
| D. | To increase coarse grain content | 
| Answer» D. To increase coarse grain content | |
| 7. | Why is the Formation of an embankment preferred over formation in a cutting? | 
| A. | It is economical | 
| B. | It has good drainage properties | 
| C. | It is easy to construct | 
| D. | Less earthwork required | 
| Answer» C. It is easy to construct | |
| 8. | What does the slide slope provided for the embankment depends upon? | 
| A. | Cost of construction | 
| B. | Traffic flow | 
| C. | Nature of soil | 
| D. | Rainfall intensity of that area | 
| Answer» D. Rainfall intensity of that area | |
| 9. | If we want to construct a single line railway track, the land available should be adequate for the construction of a double line. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 10. | Where should one refer to for the procedure of acquisition of land with the help of member state government? | 
| A. | Land Acquisition act | 
| B. | Land Surveying act | 
| C. | Rules of Railway Board | 
| D. | Indian Standard codes | 
| Answer» B. Land Surveying act | |
| 11. | What is the first step involved in Construction of a New line? | 
| A. | Ballasting of track | 
| B. | Land acquisition | 
| C. | Earthwork and bridges | 
| D. | Plate laying | 
| Answer» C. Earthwork and bridges | |