1. |
_________ is a Board placed parallel to the Ledgers and supported between the Putlogs. |
A. | Toe board |
B. | Guard rail |
C. | Raker |
D. | Bolts |
Answer» B. Guard rail | |
2. |
________ is a piece which is used to bridge an opening in a wall and it supports one end of the putlog at the opening. |
A. | Transoms |
B. | Braces |
C. | Rope |
D. | Bridle |
Answer» E. | |
3. |
_________ are the vertical members of the framework and they are either supported on the ground or embedded into the ground. |
A. | Ledgers |
B. | Standards |
C. | Putlogs |
D. | Rakers |
Answer» C. Putlogs | |
4. |
In __________ type of scaffolding, in place of timber, the Steel tubes can be effectively used for the scaffolding work. |
A. | Steel scaffolding |
B. | Patented scaffolding |
C. | Suspended scaffolding |
D. | Trestle scaffolding |
Answer» B. Patented scaffolding | |
5. |
The temporary framework is known as __________ and it is useful in construction demolition, maintenance or repair works. |
A. | Underpinning |
B. | Shoring |
C. | Scaffolding |
D. | Grouting |
Answer» D. Grouting | |