

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
1. |
What is the full form of VDL? |
A. | Variable Density Log |
B. | Variable Density Log |
C. | Variable Density Log |
D. | Variable Density Log |
Answer» C. Variable Density Log | |
2. |
What is the full form of CBL? |
A. | Cement Bond Log |
B. | Cement Bridge Log |
C. | Calculated Bond Log |
D. | Calculated Bridge Log |
Answer» B. Cement Bridge Log | |
3. |
What is Micro-Annulus? |
A. | gap that formed between the casing and surrounding cement sheath |
B. | Pipe Buckling |
C. | Ballooning of pipe |
D. | Microchannel |
Answer» D. Microchannel | |
4. |
What does Hydraulic Bond do? |
A. | Blocks the migration of cement |
B. | Chemically supports the pipe in the hole |
C. | Blocks the migration of fluids |
D. | Mechanically supports the pipe in the hole |
Answer» D. Mechanically supports the pipe in the hole | |
5. |
What does Shear Bond do? |
A. | Mechanically supports the pipe in the hole |
B. | Chemically supports the pipe in the hole |
C. | Blocks the migration of fluids |
D. | Blocks the migration of cement |
Answer» B. Chemically supports the pipe in the hole | |