Explore topic-wise MCQs in Geotechnical Engineering.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

In pressure pile, the frictional resistance is increased by __________

A. Compression of soil and Rough irregular surface
B. Bearing capacity
C. None of the mentioned
D. All of the mentioned
Answer» B. Bearing capacity
2.

In pressure piles, the soil is excavated by _________

A. Casing tube
B. Under-reamer
C. Concrete plug
D. All of the mentioned
Answer» C. Concrete plug
3.

A major difference between the procedure of construction in bored piles and cast-in-situ driving piles is ___________

A. Driving equipment
B. Method of driving
C. Concrete filling
D. None of the mentioned
Answer» B. Method of driving
4.

In bored pile, concreting is done by using ___________

A. Auger
B. Casing tube
C. Under-reamer
D. Concrete plug
Answer» C. Under-reamer
5.

There are __________ types of bored piles.

A. 4
B. 2
C. 5
D. 3
Answer» E.