1. |
In pressure pile, the frictional resistance is increased by __________ |
A. | Compression of soil and Rough irregular surface |
B. | Bearing capacity |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» B. Bearing capacity | |
2. |
In pressure piles, the soil is excavated by _________ |
A. | Casing tube |
B. | Under-reamer |
C. | Concrete plug |
D. | All of the mentioned |
Answer» C. Concrete plug | |
3. |
A major difference between the procedure of construction in bored piles and cast-in-situ driving piles is ___________ |
A. | Driving equipment |
B. | Method of driving |
C. | Concrete filling |
D. | None of the mentioned |
Answer» B. Method of driving | |
4. |
In bored pile, concreting is done by using ___________ |
A. | Auger |
B. | Casing tube |
C. | Under-reamer |
D. | Concrete plug |
Answer» C. Under-reamer | |
5. |
There are __________ types of bored piles. |
A. | 4 |
B. | 2 |
C. | 5 |
D. | 3 |
Answer» E. | |