This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
In pressure pile, the frictional resistance is increased by __________ |
| A. | Compression of soil and Rough irregular surface |
| B. | Bearing capacity |
| C. | None of the mentioned |
| D. | All of the mentioned |
| Answer» B. Bearing capacity | |
| 2. |
In pressure piles, the soil is excavated by _________ |
| A. | Casing tube |
| B. | Under-reamer |
| C. | Concrete plug |
| D. | All of the mentioned |
| Answer» C. Concrete plug | |
| 3. |
A major difference between the procedure of construction in bored piles and cast-in-situ driving piles is ___________ |
| A. | Driving equipment |
| B. | Method of driving |
| C. | Concrete filling |
| D. | None of the mentioned |
| Answer» B. Method of driving | |
| 4. |
In bored pile, concreting is done by using ___________ |
| A. | Auger |
| B. | Casing tube |
| C. | Under-reamer |
| D. | Concrete plug |
| Answer» C. Under-reamer | |
| 5. |
There are __________ types of bored piles. |
| A. | 4 |
| B. | 2 |
| C. | 5 |
| D. | 3 |
| Answer» E. | |