1. |
Which of these does not require sampling documentation at all? |
A. | 0% sampling |
B. | 100% inspection |
C. | Acceptance inspection |
D. | 50% inspection |
Answer» B. 100% inspection | |
2. |
Which of these requires planning and documentation of the sampling procedure? |
A. | Acceptance sampling |
B. | 100% sampling |
C. | 0% sampling |
D. | 50% sampling |
Answer» B. 100% sampling | |
3. |
Which has the most probability of rejecting the good lot? |
A. | Acceptance sampling |
B. | 100% sampling |
C. | 0% sampling |
D. | Can t be predicted |
Answer» B. 100% sampling | |
4. |
Which generates lesser information about the products and the manufacturing process, 100% sampling or Acceptance sampling? |
A. | 100% sampling |
B. | Acceptance sampling |
C. | Both generate equal amount of information |
D. | Can t be predicted |
Answer» C. Both generate equal amount of information | |
5. |
Which is the most expensive for the same testing process and product component to be tested? |
A. | Acceptance sampling |
B. | 100% sampling |
C. | 0% sampling |
D. | 50% sampling |
Answer» C. 0% sampling | |
6. |
Which of these quite successfully fulfills the following sentence?
|
A. | 0% sampling |
B. | 100% sampling |
C. | Random % of the lot sampling |
D. | Acceptance sampling |
Answer» E. | |
7. |
Which has lesser probability of handling damage in between 100% inspection, and the acceptance sampling procedure? |
A. | 100% inspection |
B. | Acceptance sampling |
C. | Both have equal handling damage |
D. | Can t be predicted |
Answer» C. Both have equal handling damage | |
8. |
Which has the lowest number of manpower required? |
A. | Acceptance sampling |
B. | 0% inspection |
C. | 100% inspection |
D. | 50% inspection |
Answer» C. 100% inspection | |
9. |
Which of these is used when the test of the component is non-destructive, cheap and fast? |
A. | 0% inspection |
B. | Acceptance sampling |
C. | 100% sampling |
D. | 50% sampling |
Answer» E. | |
10. |
Which of these is not an advantage of acceptance sampling over the 100% sampling plan? |
A. | Less expensive |
B. | Highly costly |
C. | Applicable to destructive testing |
D. | Lesser manpower is needed |
Answer» C. Applicable to destructive testing | |