X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished? |
| A. | 44256 |
| B. | 44257 |
| C. | 44348 |
| D. | 44352 |
| Answer» D. 44352 | |