1. |
Which of the following is a disadvantage of CD works carrying drainage over the canal? |
A. | The arrangement is generally constructed when the drain is very big as compared to the section of the canal |
B. | The damage caused by floods is not rare |
C. | The CD works are more liable to damage than the earthwork of the canal |
D. | The perennial canal is not open to inspection or maintenance |
Answer» E. | |