MCQOPTIONS
Saved Bookmarks
| 1. |
When is the Final Location survey done? |
| A. | After the particular Railway line to be constructed is decided |
| B. | After the Traffic survey |
| C. | After Reconnaissance survey |
| D. | Immediately after the collection of Field data |
| Answer» B. After the Traffic survey | |