

MCQOPTIONS
Saved Bookmarks
1. |
When is the Final Location survey done? |
A. | After the particular Railway line to be constructed is decided |
B. | After the Traffic survey |
C. | After Reconnaissance survey |
D. | Immediately after the collection of Field data |
Answer» B. After the Traffic survey | |