

MCQOPTIONS
Saved Bookmarks
1. |
What is the work of QC operator |
A. | inclusions in light contrast that are are not detected by the software have to be plotted by the qc operator, manually |
B. | verify that the inclusions plotted by the software are correct |
C. | delete the inclusions that are wrongly plotted by the software |
D. | all of the above |
Answer» E. | |