1.

What is the value of work done for the following arrangement? If, m1 = Mass of refrigerant passing through the evaporatorm2 = Mass of refrigerant passing through condenserm3 = Mass of vapor refrigerant formed in the flash chamber

A. m1 (h2 – h1) + m2 (h4 – h3)
B. m1 (h2 – h1) + m2 (h5 – h4)
C. (h8 – hf10) / (h9 – hf10)
D. (h1 – hf10) / (h4 – h9)View Answer
Answer» C. (h8 – hf10) / (h9 – hf10)


Discussion

No Comment Found

Related MCQs