What is the total cost of the project to develop a sewage treatment plant (STP) and other infrastructure in Meerut, Uttar Pradesh under Hybrid Annuity PPP mode?

A. Rs. 396.47 crores
B. Rs. 247.69 crores
C. Rs. 369.74 crores
D. Rs. 447.57 crores
Answer» D. Rs. 447.57 crores