MCQOPTIONS
Saved Bookmarks
| 1. |
Under multiprograming, turnaround time for short jobs is usually _____ and that for long jobs is slightly _____. |
| A. | lengthened; shortened |
| B. | shortened; lengthened |
| C. | shortened; shortened |
| D. | lengthened; lengthened |
| Answer» C. shortened; shortened | |