

MCQOPTIONS
Saved Bookmarks
1. |
Under multiprograming, turnaround time for short jobs is usually _____ and that for long jobs is slightly _____. |
A. | lengthened; shortened |
B. | shortened; lengthened |
C. | shortened; shortened |
D. | lengthened; lengthened |
Answer» C. shortened; shortened | |