MCQOPTIONS
Saved Bookmarks
| 1. |
Two successive Iso-hyetes in the basin drawing of catchment area are measured using _______ |
| A. | Planimeter |
| B. | Manometer |
| C. | Mass flow meter |
| D. | Chronometer |
| Answer» B. Manometer | |