MCQOPTIONS
Saved Bookmarks
| 1. |
Two cubical castings of the same metal and size of 2 cm side and 4 cm side are moulded in green sand. If the smaller casting solidifies in 2 mins, the expected time of solidifications of large casting will be |
| A. | 16 min |
| B. | 2 |
| C. | min |
| D. | 8 min |
| E. | 4 min |
| Answer» D. 8 min | |