1.

Two cubical castings of the same metal and size of 2 cm side and 4 cm side are moulded in green sand. If the smaller casting solidifies in 2 mins, the expected time of solidifications of large casting will be

A. 16 min
B. 2
C. min
D. 8 min
E. 4 min
Answer» D. 8 min


Discussion

No Comment Found

Related MCQs