MCQOPTIONS
Saved Bookmarks
| 1. |
This validation scheme is called the _________ scheme since transactions execute optimistically, assuming they will be able to finish execution and validate at the end. |
| A. | Validation protocol |
| B. | Validation-based protocol |
| C. | Timestamp protocol |
| D. | Optimistic concurrency-control |
| Answer» B. Validation-based protocol | |