

MCQOPTIONS
Saved Bookmarks
1. |
The system is designed to analyze standard slides at a_______ slides per hour rate. |
A. | 30 to 35 |
B. | 20 to 30 |
C. | 40 to 50 |
D. | 35 to 40 |
Answer» E. | |