MCQOPTIONS
Bookmark
Saved Bookmarks
→
Environmental Engineering
→
Oxidation Stabilization Ponds in Environmental Engineering
→
The maximum aeration period for a conventional act..
1.
The maximum aeration period for a conventional activated sludge system is
A.
2 hours
B.
3 hours
C.
4 hours
D.
6 hours
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which of the following has minimum hydraulic retention time?
_________ is the time at which sewage is detained in the aeration tank.
BOD of sewage is dependent on food to microorganism ratio.
The maximum BOD removal efficiency of the Step aeration process of the activated sludge system is ___________
The design value of food to microorganism ratio in the tapered aeration sludge process is ___________
_________ is defined as a volume in ml occupied by 1 gram of solid in the mixed liquor after 30 minutes of settling.
The organic loading in an activated sludge plant is defined as ___________
The maximum aeration period for a conventional activated sludge system is ___________
Which of the following has minimum hydraulic retention time?$
_________ is the time at which sewage is detained in the aeration tank.$
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply