

MCQOPTIONS
Saved Bookmarks
1. |
The installation time for a gas turbine power plant is ______________ |
A. | Comparatively less than thermal power plant |
B. | Comparatively more than thermal power plant |
C. | Equal to thermal power plant |
D. | Very much longer than thermal power plant |
Answer» B. Comparatively more than thermal power plant | |