The inside shuttering of the well curb is made up ..
1.
The inside shuttering of the well curb is made up of_________
A.
Steel
B.
Wood
C.
Brick masonry
D.
Concrete
Answer» D. Concrete
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The method that is used to avoid the further increase in tilt is ___________
In which of the following methods, hydraulic jack is used to counter attack the tilt in the well?
The radius of the well curb should be kept _________ larger than the outside radius of well steining.
Unequal dredging of well causes _________
Excavation of soil inside the well in river beds can be done by ________
The inside shuttering of the well curb is made up of _________
Laying of the well curb in river bed having water, is done by _________
IN_WHICH_OF_THE_FOLLOWING_METHODS,_HYDRAULIC_JACK_IS_USED_TO_COUNTER_ATTACK_THE_TILT_IN_THE_WELL??$
The_method_that_is_used_to_avoid_the_further_increase_in_tilt_is___________$
To counter act the tilts in the well during sinking operations, which of the following measures can be used?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply