1.

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is ________

A. 6.5 m<sup>3</sup>
B. 1.5 m<sup>3</sup>
C. 2.5 m<sup>3</sup>
D. 5.0 m<sup>3</sup>
Answer» E.