

MCQOPTIONS
Saved Bookmarks
1. |
_ The efficiency of a plant is of least concern when it is selected as$? |
A. | peak load plant |
B. | casual run plant |
C. | either (A) or (B) |
D. | base load plant |
Answer» D. base load plant | |