MCQOPTIONS
Home
About Us
Contact Us
Bookmark
Saved Bookmarks
Testing Subject
General Aptitude
Logical and Verbal Reasoning
English Skills Ability
Technical Programming
Current Affairs
General Knowledge
Finance & Accounting
GATE (Mechanical Engineering)
Chemical Engineering
→
Architecture and Planning Miscellaneous
→
Architecture and Planning Miscellaneous-topic
→
The critical activities of the project are
1.
The critical activities of the project are
A.
1.0 second
B.
1.5 second
C.
2.0 second
D.
2.5 second
Answer» C. 2.0 second
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The Remote Sensing satellite that gives the highest spatial resolution is
Bioclimatic chart developed by Victor Olgyay shows the relationship between
Match the visionaries in Group I with their concepts in Group II
Match the tombs in Group I with their architectural characteristics in Group II:
Match the building projects in Group I with their architects in Group II:
Development that meets the needs of the present generation without compromising the ability of future generations to meet their own needs is termed by UNDP as
A Single Phase Neutral (SPN) electrical circuit has a power consumption of 330W. Considering a voltage of 110V and power factor of 0.8, the electrical current drawn is ___________ Amp (up to one decimal place).
Match the cities in Group-I with their planners in Group-II
Match the building configuration characteristics in Group-I with their seismic consequences in Group-II
Match the iconic architectural examples in GroupI with their predominant structural systems in Group-II
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies