

MCQOPTIONS
Saved Bookmarks
1. |
The budgeted variable overhead rate is multiplied to actual quantity of allocation base to calculate variable manufacturing cost of overheads in |
A. | direct costing method |
B. | indirect costing method |
C. | actual costing method |
D. | normal costing method |
Answer» E. | |