MCQOPTIONS
Saved Bookmarks
| 1. |
The access time in disk scheduling is |
| A. | The time taken to position the head at the track. |
| B. | The time taken to reach the beginning of the sector of the track. |
| C. | The sum of seek time and rotational delay. |
| D. | None of these. |
| Answer» D. None of these. | |