1.

Shaft work required for vapour absorption system to produce 1 ton refrigeration may be only

A. 50 to 60% of that required for vapour compression system
B. 20 to 30% of that required for vapour compression system
C. 1 to 2% of that required for vapour compression system
D. none of the above
Answer» D. none of the above