1.

_ P.M.T.S. (Predetermined Motion Time Systems) include$?

A. M.T.M. (Method Time Measurement)
B. W.F.S. (Work Factor Systems)
C. B.M.T.S. (Basic Motion Time Study)
D. All of these
Answer» E.


Discussion

No Comment Found