

MCQOPTIONS
Saved Bookmarks
1. |
Plants with higher operating cost and greater flexibility are suitable for? |
A. | Only Base load |
B. | Only Peak load |
C. | Base and Peak loads |
D. | Plants with higher operating cost are not used |
Answer» C. Base and Peak loads | |