MCQOPTIONS
Saved Bookmarks
| 1. |
Pessimistic time is |
| A. | The maximum time which an activity might require |
| B. | The average time required for a job |
| C. | The most probable time considering all conditions |
| D. | The minimum time in which an activity can possibly be accomplished |
| Answer» B. The average time required for a job | |