MCQOPTIONS
Saved Bookmarks
| 1. |
P.M.T.S. (Predetermined Motion Time Systems) include |
| A. | M.T.M. (Method Time Measurement) |
| B. | W.F.S. (Work Factor Systems) |
| C. | B.M.T.S. (Basic Motion Time Study) |
| D. | all of these |
| Answer» E. | |