MCQOPTIONS
Saved Bookmarks
| 1. |
n an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion are |
| A. | N010 GO3 X7.0 Y2.0 I5.0 J2.0 |
| B. | N010 GO2 X7.0 Y2.0 I5.0 J2.0 |
| C. | N010 GO1 X7.0 Y2.0 I5.0 J2.0 |
| D. | N010 GOO X7.0 Y2.0 I5.0 J2.0 |
| Answer» C. N010 GO1 X7.0 Y2.0 I5.0 J2.0 | |