Item A takes 12 hours and Item B takes 15 hours to be prepared using lathe machine. Drilling time for Item A is less than the drilling time for Item B by _____% |
| A. | 25 |
| B. | 66.67 |
| C. | 39.39 |
| D. | 100 |
| Answer» D. 100 | |