MCQOPTIONS
Saved Bookmarks
| 1. |
____________ is done by suddenly increasing the load for a small period of time and observing the behavior of the system. |
| A. | Stress Testing |
| B. | Load Testing |
| C. | Spike Testing |
| D. | All of these |
| Answer» D. All of these | |