In tiled flooring, the flooring is cured for _____..
1.
In tiled flooring, the flooring is cured for __________ days before polishing it.
A.
7
B.
15
C.
21
D.
27
Answer» B. 15
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
In PVC flooring, time taken by the adhesive to set before the tiles are laid is _________
Which of the following types of flooring can be easily damaged by bringing burning objects in contact?
Which of the following types of flooring is spread directly on concrete?
Cork used in cork flooring is obtained from the bark of _____________ tree.
Granules of cork are heated with ____________ oil to manufacture cork carpet.
In rubber flooring, tiles of rubber are manufactured by mixing pure rubber with fillers like ___________
Which of the following types of flooring is used when it is required to transmit light from the upper to lower floor?
In asphalt mastic flooring ___________ should be added to the asphalt mix in order to apply it cold.
Asphalt mastic has sand and asphalt in the ratio ________
In timber flooring, the spacing between the sleeper walls is not more than __________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply