

MCQOPTIONS
Saved Bookmarks
1. |
In rate monotonic scheduling, a process with a shorter period is assigned |
A. | a higher priority |
B. | a lower priority |
C. | higher & lower priority |
D. | none of the mentioned |
Answer» B. a lower priority | |