1.

In order to prevent pollution from landfill operation which of the following provisions are supposed to be made?(i) The storm water drain shall be designed and constructed in such a way that the surface runoff water is diverted from the landfilling site and leachates from solid waste locations do not get mixed with the surface runoff water(ii) Non-permeable lining system should be provided at the base and walls of waste disposal area.(iii) Provisions for management of leachates including its collection and treatment shall be made.

A. Only (i)
B. Only (ii)
C. (i) and (ii)
D. (i), (ii) and (iii)
Answer» E.