In order to prevent pollution from landfill operation which of the following provisions are supposed to be made?(i) The storm water drain shall be designed and constructed in such a way that the surface runoff water is diverted from the landfilling site and leachates from solid waste locations do not get mixed with the surface runoff water(ii) Non-permeable lining system should be provided at the base and walls of waste disposal area.(iii) Provisions for management of leachates including its collection and treatment shall be made. |
| A. | Only (i) |
| B. | Only (ii) |
| C. | (i) and (ii) |
| D. | (i), (ii) and (iii) |
| Answer» E. | |