In CPM, the cost slope is determined by |
| A. | Crash cost/Normal Cost |
| B. | (Crash Cost - Normal cost)/ (Normal time - Crash time) |
| C. | Normal Cost/Crash cost |
| D. | (Normal cost - Crash cost)/ (Normal time - Crash time) |
| Answer» C. Normal Cost/Crash cost | |