

MCQOPTIONS
Saved Bookmarks
1. |
If two sets of limits approach is taken to construct a control chart, what are the outer set of limits called? |
A. | Action Limits |
B. | Warning Limits |
C. | Variable Limits |
D. | Constant Limits |
Answer» B. Warning Limits | |