If the peak load on a power plant having a capacity of 100 MW is 70 MW during a given week (7-days), and the energy produced is 5880000 kWh, the capacity factor (in %) for the plant for the said week is |
| A. | 35 |
| B. | 50 |
| C. | 65 |
| D. | 30 |
| E. | 70 |
| Answer» B. 50 | |