MCQOPTIONS
Saved Bookmarks
1. |
If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minutes then the value added manufacturing time is |
A. | 42.625 |
B. | 36.724 |
C. | 32.625 |
D. | 41.625 |
Answer» D. 41.625 | |