1.

If the generating station capacity increases from 10 MVA to 20 MVA, the rating requirement of the circuit breaker is ____________.

A. Remains the same but the physical size of the circuit breaker increases
B. Increases
C. Decreases
D. Stays the same
Answer» C. Decreases