

MCQOPTIONS
Saved Bookmarks
1. |
If A can complete a job in 10 days and along with B he can complete the same job in 6 days, how much of the job remain to be completed if both work for 4 days and A alone works for two more days ? |
A. | 2/15 |
B. | 3/15 |
C. | 4/15 |
D. | 7/15 |
Answer» B. 3/15 | |