 If A can complete a job in 10 days and along with B he can complete the same job in 6 days, how much of the job remain to be completed if both work for 4 days and A alone works for two more days ?

A. 2/15
B. 3/15
C. 4/15
D. 7/15
Answer» B. 3/15