If A and B together can complete a work in 18 days, A and C together in 12 days, and B and C together in 9 days, then B alone can do the work in: |
| A. | 18 days |
| B. | 24 days |
| C. | 30 days |
| D. | 40 days |
| Answer» C. 30 days | |