1. |
For carrying out load test on Hopkinson‚Äö√Ñ√∂‚à ö√ë‚à ö¬•s test setup _________________$ |
A. | Actual load is needed |
B. | By changing field currents in two machines load can be changed |
C. | Can‚Äö√Ñ√∂‚à ö√ë‚à ö¬•t carry out |
D. | By changing the armature current test is carried out |
Answer» C. Can‚Äö√Ñ√∂‚à ö√ë‚à ö¬•t carry out | |