For carrying out load test on Hopkinson’s test setup _________________$ |
| A. | Actual load is needed |
| B. | By changing field currents in two machines load can be changed |
| C. | Can’t carry out |
| D. | By changing the armature current test is carried out |
| Answer» C. Can‚Äö√Ñ√∂‚àö√ë‚àö¬•t carry out | |