MCQOPTIONS
Bookmark
Saved Bookmarks
→
Power Systems
→
Sag Tension Vibrations Dampers in Power Systems
→
Established capacity of Idukki hydroelectric proje..
1.
Established capacity of Idukki hydroelectric project
A.
740 Megawatt
B.
750 Megawatt
C.
800 Megawatt
D.
780 Megawatt
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Air pollution due to smoke around a thermal power station can be reduced by installing
A hydroelectric generating plant is supplied from a reservoir of capacity 3.6 × 106 m3 at a head of 100 m. Find the total energy available in kWh if the overall efficiency is 75%
In a steam power plant, which of the following is NOT an artificial draught?
In hydro-electric power plants, ______ reduces water hammer effect in penstock
A boiling water reactor uses which of the following as fuel?
Identify the given general symbol shown:
Kovvada nuclear plant is being set up in:-
Find the nearest Horsepower of single phase motor working at 230 V, 50 Hz for pumping 1200 litres of water to a height of 30 m. The time taken to pump the water is 15 minutes. The efficiency of the motor is 80%.
In hydro-electric plants the type of alternator used is:
A hydroelectric generating station is supplied from a reservoir of capacity 6 million m3 at a head of 170m. Determine the potential energy stored in this water.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply