MCQOPTIONS
Saved Bookmarks
| 1. |
During a CBR test, the load sustained by a remolded soil specimen at 5.0 mm penetration is 50 kg. The CBR value of the soil will be |
| A. | 10.0% |
| B. | 5.0% |
| C. | 3.6% |
| D. | 2.4% |
| Answer» E. | |